Zami
Production

Production you can plan, prove and trace.

Schedule batches, track every stage and keep food-safety records as you go.

Last updated

Controlled production, not guesswork.

Week 32On track
MonTueWedThuFri

Plan the week in one view

Batches scheduled against lines and days, with ingredient availability checked before you commit.

MixingProvingBakingPacking

Know where every batch stands

Stage-by-stage progress from mixing to packing, visible to the whole team without walking the floor.

Food safety · run 46

Metal detection
Weight sample × 5
Allergen changeover
Signed J. Snow

Audit-ready, as you go

Safety checks, sign-offs and labels are captured during the run, not reconstructed before an audit.

How it works

From plan to proof, one timeline.

01

Plan the batch

Pick the recipe, set the quantity and slot it onto a line. Zami checks the ingredients are in stock.

02

Pick ingredients

Ingredients and lots are drawn from inventory, keeping traceability from the very first step.

03

Run the stages

Each stage is ticked off on the floor, with safety checks recorded where they belong in the run.

04

Pack & approve

Packing waits on QC sign-off. Nothing moves to finished goods without approval.

05

Label

Batch, date and allergen details flow onto labels straight from the recipe and run.

06

Record

Ingredients, lots, checks and approvals stay against the batch, ready for any audit.

Recipes with real costs and real allergens.

Each recipe carries its ingredients, yields and allergen profile. When ingredient costs change, batch costs follow, so margins stay honest.

  • Live batch costingBuilt from current ingredient prices.
  • Allergen trackingDeclared once, carried to every label.
  • Yield & scalingScale a recipe up and quantities follow.
Yield 180
$342.90batch cost
×1.5 yield
GlutenWheat
Flour96.0 kg
Water61.5 kg
Starter19.2 kg
Salt1.8 kg

Nothing ships without sign-off.

QC checks gate the move into finished goods. Approvals are named and time-stamped, and labels print only once the batch is cleared.

  • Safety formsCompleted on the floor, stored with the batch.
  • Named approvalsWho signed off, and when.
  • Batch labelsBatch number, dates and allergens, automatically.
Packing #8-9038Approved
MetalWeightSign-off
Finished goods

Labels released for print

Build production labels visually.

Design labels on a drag-and-drop canvas. Position text, images, barcodes, QR codes and dynamic production data, then preview and print.

  • Drag-and-drop canvasAlignment, snapping and layer reordering.
  • Label elementsText, image, barcode, QR and dynamic production data.
  • Reusable templatesExact dimensions and grouping, saved for the next run.

Sourdough 800g

Batch #8-9038 · Packed 12 Aug

Best before 19 Aug

9300652001234
TextQRBarcodeData

Build safety reports around your production process.

Managers build custom safety report templates and choose when they’re required. Production staff complete them on the production screen, before a run starts or before it closes.

  • Required questionsAsked at production start or end.
  • Completed on the floorThe operator fills the form during the run.
  • Stored with the batchSubmitted reports join the historical safety record.
Start-of-run formStored
Surfaces sanitised
Cool-room °C3.4
NotesOptional · skipped
Stored on batch #8-9046

Everything production covers.

Batch scheduling

Plan runs across lines and days in a visual timeline you can share.

Stage progress

Live status from mixing to packing, visible per batch as it moves.

Recipe management

Ingredients, yields, costs and allergens kept in one place.

Ingredient traceability

Trace any finished batch back to the lots that went into it.

Packing approvals

QC gates with named, time-stamped sign-offs before anything ships.

Safety forms & labels

Checks recorded in the run, with labels printed from the batch.

FAQs

Questions & Answers

Yes. Every batch records the ingredient lots drawn from inventory, so you can trace forwards from a delivery or backwards from a finished product.

Packing is gated behind QC approval. Until the nominated approver signs off, the batch can’t move into finished goods or have labels printed.

Safety checks and forms are completed as part of the production run and stored against the batch, named, time-stamped and ready to produce for an audit.

Yes. Recipes cost batches from current ingredient prices, so you see the real margin on every run rather than last quarter’s estimate.

Couldn’t find an answer? Send us a message

Contact support
Get started

Made for the real pace
of your day-to-day business.

Software that stays responsive, even at your full speed.